Genie Z-25J Manual de usuario Pagina 35

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 59
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 34
Operator's ManualFourth Edition · First Printing
Part No. 114339 Z-45/25 • Z-45/25J 33
Inspections
Test Limited Drive Speed - Standard Base
Models
36 Press down the foot switch.
37 Raise the primary boom approximately
2 feet / 61 cm.
38 Slowly move the drive control handle to the full
drive position.
Result: The maximum achievable drive speed
with the primary boom raised should not exceed
1 foot / 30 cm per second.
39 Lower the primary boom to the stowed position.
40 Raise the secondary boom approximately
2 feet / 61 cm.
41 Slowly move the drive control handle to the full
drive position.
Result: The maximum achievable drive speed
with the secondary boom raised should not
exceed 1 foot / 30 cm per second.
42 Lower the secondary boom to the stowed
position.
43 Extend the primary boom approximately
1 foot / 30 cm.
44 Slowly move the drive control handle to the full
drive position.
Result: The maximum achievable drive speed
with the primary boom extended should not
exceed 1 foot / 30 cm per second.
45 Retract the boom to the stowed position.
If the drive speed with the primary boom raised, the
secondary boom raised or the primary boom
extended exceeds 1 foot / 30 cm per second,
immediately tag and remove the machine from
service.
Test Limited Drive Speed - Narrow Base Models
36 Press down the foot switch.
37 Raise the primary boom approximately
2 feet / 61 cm.
38 Slowly move the drive control handle to the full
drive position.
Result: The maximum achievable drive speed
with the primary boom raised should not exceed
6 in / 15 cm per second.
39 Lower the primary boom to the stowed position.
40 Raise the secondary boom approximately
2 feet / 61 cm.
41 Slowly move the drive control handle to the full
drive position.
Result: The maximum achievable drive speed
with the secondary boom raised should not
exceed 6 in / 15 cm per second.
42 Lower the secondary boom to the stowed
position.
43 Extend the primary boom approximately
1 foot / 30 cm.
44 Slowly move the drive control handle to the full
drive position.
Result: The maximum achievable drive speed
with the primary boom extended should not
exceed 6 in / 15 cm per second.
45 Retract the boom to the stowed position.
If the drive speed with the primary boom raised, the
secondary boom raised or the primary boom
extended exceeds 6 in / 15 cm per second,
immediately tag and remove the machine from
service.
Vista de pagina 34
1 2 ... 30 31 32 33 34 35 36 37 38 39 40 ... 58 59

Comentarios a estos manuales

Sin comentarios